Total Demolition of Major Interchange in Montreal, QC

Total demolition of a specific section of Montreal’s Turcot Interchange

This road infrastructure demolition over and along Highway 20 at Angrignon included the demolition of four entrance/exit ramps and viaducts. In addition to having to coordinate with other contractors on the same site and asbestos abatement prior to beginning, the 1,545-meter-long winter project consisted of demolishing, crushing, and upgrading more than 23,000 m3 or 580,000 t of concrete and asphalt.

SERVICES PROVIDED:

  • Total demolition
  • Asbestos abatement
  • Metal recycling
  • Managing non-recyclable waste (cardboard)
  • Concrete and asphalt crushing and reclamation
  • Civil engineering

VARIOUS CHALLENGE:

  • Strict HSE requirements
  • Project magnitude
  • Meeting tight deadlines
  • Working on same site with other subcontractors
  • Weekend road closures (traffic)
  • Dust management
  • Working in winter