Total Deconstruction of a Hotel Complex in Turks and Caicos Islands

This project involved the total demolition of a 400-room hotel complex on an isolated island with limited access to adequate demolition equipment. In order to assemble the fleet of mobile equipment required for the project to progress well, Démex had several equipment transported from Florida and carried out the maintenance itself and on the spot with the available means.

SERVICES PROVIDED:

  • Total demolition
  • Stripping
  • Waste Segregation
  • Waste management
  • Concrete crushing
  • Structural engineering

VARIOUS CHALLENGES:

  • Remote and isolated site
  • Very complex logistics
  • Adhering to tight deadline (100 days)
  • Work in extreme heat