Total Demolition of a Mine Shaft Headframe in Val-D’Or, QC

The 40- meters high wooden, steel structure, as well as the winch room with two drums weighing over 30 t each, were first dismantled while the winch itself was cut and upcycled. The hoisting structure had been part of Val D’or’s landscape for a long time and community approval was a very important part of the project.

 

Back to Démex projects